2_GROUNDBED SITE CHECK LIST

2_GROUNDBED SITE CHECK LIST

1. Task advise 24h before start

Result (pass or not pass) - Item 1

2. Check of anodes conformity

Result (pass or not pass) - Item 2
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

3. Check of presence of damage and if damage is reparable (if any)

Result (pass or not pass) - Item 3
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

4. Written approval of Company of damage reparation (if any)

Result (pass or not pass) - Item 4
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

5. Reparation and check (if any)

Result (pass or not pass) - Item 5
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

6. Check of the backfill conformity

Result (pass or not pass) - Item 6
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

7. Check the proper compaction of 1st layer of backfill

Result (pass or not pass) - Item 7
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

8. Check the proper laying of anodes over the 1st layer and interspace between anodes in compliance with specifications and layout

Result (pass or not pass) - Item 8
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

9. Check the proper compaction of 2nd layer of backfill

Result (pass or not pass) - Item 9
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

10. Test of electrical continuity of groundbed cable

Result (pass or not pass) - Item 10
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

11. Test of electrical continuity of existing cable and insulation vs ground

Result (pass or not pass) - Item 11
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

12.Check of electrical continuity of groundbed cable

Result (pass or not pass) - Item 12
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

13.Pull test of cable connections with crimped “C” connector

Result (pass or not pass) - Item 13
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

14. Check of splicing kit installation

Result (pass or not pass) - Item 14
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

15. Test of groundbed resistance and TR current drainage

Result (pass or not pass) - Item 15
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

16. Check of warning tape installation

Result (pass or not pass) - Item 16
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

17. Check of the proper installation of warning tape

Result (pass or not pass) - Item 17
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

18.As Built red copy

Result (pass or not pass) - Item 18
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

Company Approval SNAM

Cancella la firma
This signature will be used exclusively for this document

CP 3rd Level Technician Supervisor FM Engineering (PF)