6_EXISTING CABLE SITE CHECK LIST

6_EXISTING CABLE SITE CHECK LIST

1. Task advise 24h before start

Result (pass or not pass) - Item 1

2. Test of insulation resistance

Result (pass or not pass) - Item 2
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

3. Test of electrical continuity

Result (pass or not pass) - Item 3
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

4. Check of presence of damage and if damage is reparable (if insulation/continuity test is not passed)

Result (pass or not pass) - Item 4
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

5. Written approval of Client of damage reparation (if insulation/continuity test is not passed)

Result (pass or not pass) - Item 5
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

6. Reparation and check (if possible) or change the cable

Result (pass or not pass) - Item 6
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

7. Check of the cable laying and backfilling

Result (pass or not pass) - Item 7
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

8. Test of electrical continuity and insulation after reparation

Result (pass or not pass) - Item 8
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

Company Approval SNAM

Cancella la firma
This signature will be used exclusively for this document

CP 3rd Level Technician Supervisor FM Engineering (PF)

Cancella la firma
This signature will be used exclusively for this document

Executing Company SCOGAT

Cancella la firma
This signature will be used exclusively for this document