F.M. Engineering

1. Task advise 24h before start

1. ESCAVATION SITE CHECK LIST

1. Task advise 24h before start

Result (pass or not pass) - Item 1

2. Check of the escavation position

Result (pass or not pass) - Item 2
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

3. Check of the presence of stone inside the escavation

Result (pass or not pass) - Item 3
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

4. Check of the escavation dimension for the GB or MP or cable route or CP welding on pipe

Result (pass or not pass) - Item 4
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

5. Check of the backfill soil is without stone

Result (pass or not pass) - Item 5
Drag & Drop Files, Choose Files to Upload Puoi caricare fino a 3 file.

Company Approval SNAM

Cancella la firma
This signature will be used exclusively for this document

CP 3rd Level Technician Supervisor FM Engineering (PF)

Cancella la firma
This signature will be used exclusively for this document

Executing Company SCOGAT

Cancella la firma
This signature will be used exclusively for this document